The Ministry of New and Renewable Energy’s (MNRE) target of 100GW solar by 2022 includes a huge 40GW rooftop target in a market that has barely taken off in the country. Not only that, but there has been precious little detail published on how the target will be reached, other5kw 3kw 2kw 1kw solar system solar panel than the expectation of a huge jump from 200MW installed in 2015/16 to 4.8GW in 2016/17.

In a blog, Bridge to India said in the last year from November 2014 to October 2015, India added 240MW of rooftop capacity, up from 154MW in the previous year.

5kw 3kw 2kw 1kw solar system solar panel

The firm claimed that MNRE is ready to place a new rooftop solar policy in front of India’s Union Cabinet. It is expected to include detail on operational and economic support for rooftop solar in India.

  • 17th Floor, Building No.3, Xinglinwan Operation Center, Jimei District, Xiamen City, P. R. China
  • +86 0592-5211-388
  • +86 0592-5235-788
  • info@esolarfirst.com

Project Photos

  • 2-Axis Solar Sun Tracker
  • 11.5KW Flat Roof Mounting Brack
  • 65KW Mexican Roof Mounting Brac
  • 419KW Japan Aluminum Ground mou
  • 132.5KW Vietnam Ground Pile Mou
  • 86.5KW Yunnan Metal Roof Mounti

About Solar First

Solar First is a high-tech enterprise specialized in manufacturing solar PV products. With our professional R & D team, efficient management team and high quality of the workforce, Solar First staffs commit to provide customers with the most stable & reliable, economical & efficient solar PV system solutions.


Read more