

● Proyek DATONG, Proyek Tracker 2MW Tiler Shanxi 2MW
● Kapasitas sing diinstal: 2mwp
● Tipe sistem nelusuri: tracker miring
● Lokasi proyek: Datong, Shanxi
● Wektu konstruksi: April 2015
Wektu Pos: Jul-04-2022
● Proyek DATONG, Proyek Tracker 2MW Tiler Shanxi 2MW
● Kapasitas sing diinstal: 2mwp
● Tipe sistem nelusuri: tracker miring
● Lokasi proyek: Datong, Shanxi
● Wektu konstruksi: April 2015