
● Liaoning 280kW Dual Axis tracking
● Installation capacitatem: 280KWP
● tracking ratio type: Dual axis
● Project Location: Liaoning
● Construction Time: November MMXII
Post tempus: Jul-04-2022
● Liaoning 280kW Dual Axis tracking
● Installation capacitatem: 280KWP
● tracking ratio type: Dual axis
● Project Location: Liaoning
● Construction Time: November MMXII