

● Datong, Shanxi 2MW tilted tracker project
● Installed capacity: 2MWp
● Tracking system type: tilted tracker
● Project Location: Datong, Shanxi
● Construction time: April 2015
Post time: Jul-04-2022
● Datong, Shanxi 2MW tilted tracker project
● Installed capacity: 2MWp
● Tracking system type: tilted tracker
● Project Location: Datong, Shanxi
● Construction time: April 2015