

● Shanxi Datong 2MW Tilted tracker
● Installed capacity: 2MWp
● Tracking system type: Tilted tracker
● Project Location: Datong, Shanxi
● Construction time: April 2015
Post time: Jul-04-2022
● Shanxi Datong 2MW Tilted tracker
● Installed capacity: 2MWp
● Tracking system type: Tilted tracker
● Project Location: Datong, Shanxi
● Construction time: April 2015