

● Shanxi Datong 1.5MW dual-axis tracking
● Installed capacity: 1.5MWp
● Tracking System Type: Dual Axis
● Project Location: Datong, Shanxi
● Construction time: April 2015
Post time: Jul-04-2022
● Shanxi Datong 1.5MW dual-axis tracking
● Installed capacity: 1.5MWp
● Tracking System Type: Dual Axis
● Project Location: Datong, Shanxi
● Construction time: April 2015